$9,147.77 – $12,667.45Price range: $9,147.77 through $12,667.45
Standard Catalog Availability: Assembled-to-order configurations ship in 5–10 Business Days. Need shaft extenders for wider beam flanges or F/R/L air prep kits? Request a Quote.
| Model # | Capacity | Flange Range | Speed | Net Wt. | Lead Time |
|---|---|---|---|---|---|
| MCR1000 | 1/4–1 Ton | 2.28–5.00 in | 65 FPM | 102 lbs | 5–10 Business Days |
| MCR3000 | 2–3 Ton | 3.94–6.02 in | 65 FPM | 166 lbs | 5–10 Business Days |
| MCR6000 | 6 Ton | 4.92–7.02 in | 65 FPM | 166 lbs | 5–10 Business Days |
To ensure safe operation and protect from collisions.

Compact yet heavy-duty MCR trolleys are able to transport heavy loads in the most demanding or harsh environments.

| Weight | N/A |
|---|---|
| Dimensions | 48 × 40 × 32 in |
| Capacity | 1/4–1 Ton, 2–3 Ton, 6 Ton |
| Control | 4-Button Pendant (6 ft Drop) |