$16,475.42 – $30,775.11Price range: $16,475.42 through $30,775.11
Standard Catalog Availability: Assembled-to-order configurations ship in 5–10 Business Days. Need a stocked 25 ft Quick Ship lift, custom height, or crane kit? Request a Quote.
| Model # | Capacity | Lift | Voltage | Speed | Net Wt. | Lead Time |
|---|---|---|---|---|---|---|
| RYU030A33HDD4 | 3 Ton | 33 ft | 460V 3-Phase | 26/4.3 FPM | 1048 lbs | 5–10 Business Days |
| RYU030A33HDD2 | 3 Ton | 33 ft | 208-230V 3-Phase | 26/4.3 FPM | 1048 lbs | 5–10 Business Days |
| RYU050B33HDD2 | 5 Ton | 33 ft | 208-230V 3-Phase | 26/4.3 FPM | 1092 lbs | 5–10 Business Days |
| RYU075C30HDD2 | 7.5 Ton | 30 ft | 208-230V 3-Phase | 20/3.3 FPM | 2227 lbs | 5–10 Business Days |
| RYU075C40HDD4 | 7.5 Ton | 40 ft | 460V 3-Phase | 20/3.3 FPM | 2397 lbs | 5–10 Business Days |
| RYU075C40HDD2 | 7.5 Ton | 40 ft | 208-230V 3-Phase | 20/3.3 FPM | 2397 lbs | 5–10 Business Days |
| RYU100C40HDD4 | 10 Ton | 40 ft | 460V 3-Phase | 20/3.3 FPM | 2397 lbs | 5–10 Business Days |
| RYU100C40HDD2 | 10 Ton | 40 ft | 208-230V 3-Phase | 20/3.3 FPM | 2397 lbs | 5–10 Business Days |
The variable frequency drive provides a soft start/stop to minimize load swing, with adjustable high and low speeds.
Harrington’s premium wire rope (IWRC, coated core)
provides high resistance to fatigue and wear.
Made of high strength polymer for durability, our rope guide keeps the rope securely in the groove on the drum.
The pull-rotor motor brake on 3 & 5 Ton models,
and a magnetic disc brake on 7.5 and 10 Ton
models. Both brakes provide reliable
and safe operation and exceptional durability.
| Weight | N/A |
|---|---|
| Dimensions | 48 × 40 × 32 in |
| Capacity | 3 Ton, 5 Ton, 7.5 Ton, 10 Ton |
| Lift | 30 ft, 33 ft, 40 ft |
| Voltage | 208-230V 3-Phase, 460V 3-Phase |